Sky Tower CFD simulations of smoke control systems in the underground car park and the shopping mall in a mixed-use development
Obiekt przemysłowy CFD simulation of temperature distribution for the purposes of analysis of fire resistance of structural elements in a covered coal storage dome and transportation gallery at a cola-fired power plant
Hala widowiskowo-sportowa Spodek Computer CFD simulations of the natural smoke and heat exhaust ventilation system (SHEVS) for sports and entertainment hall. Hot smoke tests before and after the modernization of the smoke ventilation system.
Q22 CFD analysis of smoke ventialtion system and thermal loading in a high-rise office building, taking into account high-pressure water mist system
Magnolia Shopping Centre Concept design and CFD simulations of smoke ventilation system in the extended part of the shopping mall
Wieże Jesionowa Concept design and CFD simulation of a smoke ventilation system in underground car park under high rise residential building.
Wrocław Technical University (Building A-1) CFD analysis of smoke spread in the corridors and open stairways, hot smoke tests
Nowa Łódź Fabryczna Detailed CFD analysis including verification of the smoke removal system of the underground train station and a railway tunnel. Performing evacuation time analysis. Structura fire anaysis of the tunnel structure and steel structure of the skylights in the station.
Promenady Wrocławskie Concept design and CFD simulation of a smoke ventilation system of underground car parks for fased designed large residential development Promenady Wrocławskie
Nestle Purina Concept design of smoke ventilation system, fire protection strategy and formal approval of building permit design for an extension to existing pet food factory.
Galeria Libero Concpet design of smoke ventilation systems, CFD simulations and hot smoke tests in a large, multi-storey shopping centre
Engine production facility Concept design of a natural smoke ventilation system, fire protection strategy, formal approvals and construction stage advice for an automotive production facility
Museum Concept design and CFD simulations of natural and mechanical smoke control system in the underground museum building
CH Ostrovia Consultancy and design proposal for modyfications and improvements of a natural smoke control system and CFD simulations in the existing single storey shopping mall at the material the alteration stage
CH Viktor Consultancy and design proposal for modyfications and improvements by provision of a natural smoke control system and CFD simulations in the existing single storey shopping mall
Staircase (industrial building) CFD verification of the proposed natural smoke ventilation system of a spacious staircase
Ferio Legnica CFD simulations of smoke conditions in a fire situation, technical expertise of the state of fire protection
Galeria Gorlicka Concept design and CFD simulations of natural smoke control system in the single storey shopping mall
Volvo WA Consultancy and design proposal at extention and modification of an existing office boulding in atrium area, smoke control system CFD and evacuation simulations including a performance examination of existing fire glazing system in fire conditions (performance based design)
Stadion Olimpijski Detailed analyzis of the evacuation time of the stands of the modernized and rebuilt Olympic Stadium in Wrocław
Distribution centre Bielany CFD analyzes for the needs of technical expertise in the state of fire protection
Piękna 21 CFD simulations of smoke ventilation systems and hot smoke tests in an underground car park
Kaufland Długosza Concept design and CFD simulations of a mechanical smoke ventilation system in the retail building
Leroy Merlin Krakowska Concept design and CFD simulations of natural smoke control ventilation system in the existing single storey retail boulding
Legnicka Street Concept design and CFD simulation of a smoke ventilation system of the underground car parks for a fased large office and residenctial development.
Starter III Concept design and CFD simulations of a jet fan smoke ventilation system in the enclosed car park
Kępa Mieszczańska Concept design and CFD simulations of a jet fan smoke ventilation system in underground car park, fire protection strategy and formal design approval for a residential scheme
C.H. Tarnovia Consultancy and design proposal for modyfications and improvements of natural smoke control system and CFD simulations in the part of the existing shopping mall
Kamienna 145 Concept design and CFD simulation of a smoke ventilation system of the underground car parks for a fased constructed large residenctial development.
Angel Wings (etapy C i D) Concept design and CFD simulations of a jet fan smoke ventilation system in underground car park, fire protection strategy and formal design approval for a residential scheme
Warehouse Concept design of natural smoke ventilation and formal approval with respect to fire protection requireemtns for an extension to exisitng warehouse building
Infinity Concept design and verification of a ducted smoke ventilation system for an underground three storey car park in an office building
Nowe Żerniki (K4) Concept design and CFD simulations of a jet fan smoke ventilation system in underground car park, fire protection strategy and formal design approval for a residential scheme
Krakowskie Tarasy Concept design and CFD simulation of a smoke ventilation system of the underground car parks for a fased constructed large residenctial development.
Grabiszyńska Concept design and CFD simulation of a smoke ventilation system of the underground car parks for a fased constructed large residenctial development.
Krakowska 29 Concept design and CFD simulation of a jet fan smoke ventilation system of an underground car park in an office biulding, hot smoke tests at the final construction stage.
Strzegomska Concept design and CFD simulation of a ducted smoke ventilation system of an underground car park in an office biulding.
Wrocław 101 Formal approval of fire safety aspects for an amended building permit design of an office building
Osiedle Przystań Concept design and CFD simulation of a smoke ventilation system of an underground car park in a residential biulding provided with an external smoke exhaust system verified by hot smoke test (HST).
Hala Targowa Żory Cencept design and CFD simulation of a natural smoke control system of a new single storey enclosed market hall
Nova Papiernia Concept design and CFD simulations of a jet fan smoke ventilation system in the enclosed car park, fire protection strategy, formal approval
Food production plant Fire safety strategy and approval of building permit design of a production facility
DIY shop Concept design and verification of a natural smoke control system based on recommendations of BS 7346-4 for a commercial one storey building
Planetarium CFD computer analysis of smoke and temperature distribution in an atrium space of a 3-storey building with an exhibition and teaching function for the purposes of assessing evacuation conditions.
Congress centre ICE Hot smoke tests in the main entrance hall atrium, concert fall and underground car park
Distribution centre CFD simulations and evacuation analysis of a 21000 m2 distribution facility. Concept design of smoke ventilation system in accordance with NFPA 204
Retail building Lokalizacje: Wrocław, PL Zleceniodawca: Inwestor: Kaufland Architekt/Projektant: TH Architekci Wykonawca: Wartość inwestycji:
Promenady Wrocławskie Concept design and CFD simulation of a smoke ventilation system of underground car parks for a phased designed large residential development Promenady Wrocławskie
Bydgoszcz Railway Station CFD analysis of smoke ventilation system in a two-storey concourse atrium of a railway station. Hot smoke tests of the system after completion of construction works.
Zakład produkcji katalizatorów Smoke and heat exhaust ventilation system (SHEVS) design for an industrial building
Aleja Piastów Concept design and CFD simulation of a smoke ventilation system of underground car parks for a phased designed residential development.
Promenady Zita Development and verification of smoke ventilation strategy for an underground car park in an office building
Piękna Concept design and CFD simulations of a jet fan smoke ventilation system in an enclosed car park
Nordic Heaven Apartments Concept design and CFD verification of a smoke ventilation system for an underground car park of a mixed use building.
Osada Kminkowa Concept design and CFD simulation of a smoke ventilation system of underground car parks for phased designed residential development, hot smoke tests at the final stage of buildings A2-A6
Ogórkowa Concept design and CFD simulations of a jet fan smoke ventilation system in an enclosed car park
Garaż Strzegomska Concept design and CFD verification of a smoke ventilation system in a multistorey car park building with an undeground levels
Miodowa Shopping Centre Concept design of a smoke control system of a shopping mall with verification calculations. The scope of the analysis included the natural smoke removal system in a shopping mall as well as in the anchor store.
Kurkowa Concept design for two buildings (residential and office) of a jet fan smoke ventilation system verified by CFD simulations
Narodowe Forum Muzyki Analysis of the effectiveness of the mechanical smoke exhaust system in the main entrance hall atrium and concert halls for the purpose of assessing the evacuation conditions
Multistorey car park CFD simulations of thermal conditions during a fire in an open-sided multi-storey car park
Da Vinci Concept design for several buildings in the area of “Da Vinci” district, CFD simulations of a jet fan smoke ventilation system in underground car parks.
Innova Concept design for several buildings in the area of “Innova” district, CFD simulations of a ducted and jet fan smoke ventilation system in underground car parks, hot smoke tests for two phases (buildings B3 and B5).
Centrum Handlowe Auchan Concept design based on BS 7346 and detailed CFD simulations of smoke ventilation system for an extension to an exisiting shopping centre
Centrum Kultury Zamek Verification of the smoke ventilation system in the area of the entrance hall and the covered inner courtyard within the imperial castle in Poznań.
Centennial Hall – underground car park Verification of the smoke ventilation system in a two-level underground car park
Warsaw Spire Fire safety engineering advice for the Warsaw Spire project including CFD modelling and evacuation time analysis
Aleja Wiśniowa Concept design and CFD simulations of a jet fan smoke ventilation system in underground two levels car park
Biblioteka Uniwersytetu Wrocławskiego CFD smoke simulation in fire conditions and analysis of evacuation conditions in the University Library building
Przejście podziemne CFD simulation and analysis of evacuation conditions in a shopping area / underground pedestrian passage
Europolis Logistic Center Concept design in accordance with NFPA 204 of a natural smoke and heat exhaust ventilation system (SHEVS) for two warehouse buildings
Carlow Shopping Centre Concept design of a smoke exhaust ventilation system in a shopping mall (as an external consultant for Ahearne Fire Engineering Consultants)