/ Projects / Office

Office

Q22

CFD analysis of smoke ventialtion system and thermal loading in a high-rise office building, taking into account high-pressure water mist system

Volvo WA

Consultancy and design proposal at extention and modification of an existing office boulding in atrium area, smoke control system CFD and evacuation simulations including a performance examination of existing fire glazing system in fire conditions (performance based design)

Legnicka Street

Concept design and CFD simulation of a smoke ventilation system of the underground car parks for a fased large office and residenctial development.

Budynek biurowy

Fire safety advice and formal approval for an office building

Warehouse

Concept design of natural smoke ventilation and formal approval with respect to fire protection requireemtns for an extension to exisitng warehouse building

Infinity

Concept design and verification of a ducted smoke ventilation system for an underground three storey car park in an office building

Krakowska 29

Concept design and CFD simulation of a jet fan smoke ventilation system of an underground car park in an office biulding, hot smoke tests at the final construction stage.

Strzegomska

Concept design and CFD simulation of a ducted smoke ventilation system of an underground car park in an office biulding.

Wrocław 101

Formal approval of fire safety aspects for an amended building permit design of an office building

Promenady Zita

Development and verification of smoke ventilation strategy for an underground car park in an office building

Nordic Heaven Apartments

Concept design and CFD verification of a smoke ventilation system for an underground car park of a mixed use building.

Garaż Strzegomska

Concept design and CFD verification of a smoke ventilation system in a multistorey car park building with an undeground levels

Kurkowa

Concept design for two buildings (residential and office) of a jet fan smoke ventilation system verified by CFD simulations

Warsaw Spire

Fire safety engineering advice for the Warsaw Spire project including CFD modelling and evacuation time analysis